Conceiving construction plans
To help develop this article, click 'Edit this article'.
Contents |
[edit] Introduction
Construction planning is the process of formulating activities required to undertake a construction project. This includes analysing the implications of each activity and selecting from the alternatives the appropriate method to accomplish the project goals.
Construction plans are used to prepare budgets and schedule works and to determine which participants are necessary in the project team.
[edit] Purpose of planning
Construction planning is crucial for successful completion of projects within the set time, quality and cost. It is an integral part of project execution that involves all stakeholders to ensure delivery and compliance.
[edit] Key considerations in construction planning
There are technical issues that must be taken care of in the preparation of construction plans. These aspects form the basic parts of the plan and can also be used as guidelines to analyse the effectiveness of the final plan.
First and foremost is the choice of construction methods and technologies to be used. This is a high priority since it has an impact on material choices. It also allows planners to check and compare technologies, classes of work required, types of systems for the structure and environmental implications.
It is also necessary to keep in mind that preparation of a construction plan is a backward reasoning process that seeks to define tasks, set time and assign resources to reach a predetermined outcome.
Prior to this it is important to determine what the emphasis of the plan should be. Is it directed towards cost control , schedule control (or quality)? With cost control, it is better to evaluate direct and indirect costs (such as overhead costs, financing costs, activity cost and so on). With schedule control as the focus, the main criteria should be on the precedence of activities, efficiency, resource availability and utilisation and integration of schedule and budget.
[edit] Construction method
The selection of different technological and methodological alternatives for the construction of the designed structure starts in the preliminary design stages. Often at this stage, alternatives are devised by architects and are hypothetical and abstract. They form the basis for the future detailed development of the construction method to be used, which may involve engineers, contractors, suppliers and specialists.
From a number of developed alternatives, the analysis is made weighing the cost, time and quality for each method. Depending on the availability of equipment, effects of each method and the skills available for each method, the most feasible method is chosen and a detailed plan is prepared.
[edit] Setting up project activities
It is important to take into consideration the technology and methods selected for the project. Individual activities should be scheduled in accordance with the defined precedent of works, since this will help to frame efficient organisation of construction tasks and allocate resources dependent on often repeated activities.
The defined activities should be developed in detail for all the tasks, including time and resources (equipment and labour), planning.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.